White Paper:
Six Steps to an Accurate EAC
Not having an accurate estimate at completion (EAC) is like going someplace you’ve never been before without a map to guide you. But, putting together an accurate EAC is a challenge; often, most of its required inputs live in different systems with different teams.
Highlights include:
- The six key characteristics of an accurate EAC including:
- Time-phased estimates
- Cost and schedule integration
- Risk and contingency
- The benefits of top-down planning
- The business case for ensuring EAC integrity